Publication Abstract




Proceedings of DFI-India 2019: 9th Conference on Deep Foundation Technologies for Infrastructure Development in India, (DFI)

Construction of the Foundations of Mega Sea Bridge of India - Mumbai Trans-Harbour Link
Ekhlaq A. Khan

The new Sea link Bridge over Main land Sewri on Mumbai side to Ulwe on Navi Mumbai side is characterized by some aesthetically appealing elevations of the Bridge and large spans. This paper gives an insight to design and construction technique adopted for foundation construction of the Trans-Harbour Link Package-1 at Sewri end, Site being located in intertidal zone had its unique geological characteristics and own set of challenges during construction.


 article #3308; publication #1059 (India2019)