Pile capacity management by the application of Statnamic loading test
Shinji Nishimura

A management concept of installation pile has developed to quality assurance of the large number of driven pile. Site specific coefficient for the driving formula determined from the results of load test by the dynamic and Statnamic. They are performed on the selected piles. Remaining piles are supervised by the conventional driving formula with rebound measurement without load tests. This paper presents a case history of this application on the pile for pier of Tachibana Electric Power Station.


 article #351; publication #34 (IC-1998)