Publication Abstract




Proceedings of the 45th Annual Conference on Deep Foundations, 2020 - ONLINE , (DFI)

Costa Rica Circunvalacion Norte Project: Lessons Learned from Foundation Drilling
Bernardo J. Jiménez Vega, Roberto Acosta Mora, Harlem Lora

Circunvalacion Norte project is currently the most important infrastructure project in Costa Rica. It is the last segment of the urban perimeter highway. Site investigation of local geotechnical conditions were studied by SPT, CPT, pressuremeter tests and boreholes. A static load test was executed as a proof test with an associated ultimate resistance of 12056 kN (2710 kips). Drilled shaft design was done using PMT tests and axial nominal resistance varied between 4000 kN (900 kips) and 6000 kN (1350 kips). A total of 416 drilled shafts were constructed in 15 months with drill performance of 32 m/day (105 ft/day). Drilled shaft lengths varied between 4,0 (13 ft) m and 40,0 m (130 ft). Self-consolidating concrete was used to achieve an adequate workability even in high densities rebar cages. Several site conditions proved the importance for maintenance of the working platform, predrilling of rock sockets and having spare parts to avoid increase in project's cost. New procedures were taken to prevent concrete segregation on excavations near underground water flow. Monitoring the quality of the shafts from CSL test showed less than 3% of the shafts presented a considerable anomaly, which proved that the adopted construction method and materials were adequate. For the concrete anomalies, successful remediation was performed by means of grout at the base of the shaft with two different types of drilling methodology depending on the concrete anomaly.


 article #3682; publication #1073 (AM-2020)