(ACIP-2002) Proceedings - DFI Specialty Seminar,
Augered Cast-In-Place Piles Seminar- 2002, San Francisco, CA

article# description author(s)
959 Capitol Area East End Complex Blocks 171 through 174 Sacramento, CA: A Case History involving the Application of APGD and APG Piling Methods Brian R. Zuckerman, P.E.
958 Automated Instrumentation for ACIP and Drilled Displacement Piles John Lemke, G.E.
957 San Bruno Jail Augered Cast-in-Place Pile Case History Mike Majchrzak
956 The Colosseum at Caesars Palace, Las Vegas: A Case Study of Design Build CFA Foundations Gordon King
955 Auger Pressure Grouted Displacement Piles Installed & Tested on the Margins of the San Francisco Bay Christian Divis, Cary Ronan
954 Quality Control of Augered Cast-in-Place and Displacement Piles Rudolph P. Frizzi, P.E.
953 Augered Cast-in-Place Pile Inspector's Video Acknowledgements Rudolph P. Frizzi, P.E.
952 Installation of Augered Cast-in-Place Piles Tracy Brettmann, PE